Solar power in Nevada has been growing, due to a Renewable Portfolio Standard which requires 20% renewable energy by 2015, and 5% from solar power. Nevada, at the end of 2007, became home to then-largest photovoltaic power plant in the world, the 14.2 megawatt (peak) Nellis Solar Power Plant, which, by selling the renewable energy credits (RECs), was able to provide Nellis Air Force Base with electricity for only 2.2 cents/kWh, compared to the 9 cents they are paying Nevada Power. Since then many larger solar power stations have been built in Nevada, with more proposed.
Nevada has vast deserts, and is capable of providing a great amount of solar power. The Nellis power plant only occupies 140 acres (57 ha) of land.
Maps, Directions, and Place Reviews
Solar Power Plants
Notable solar power plants in Nevada include the Nellis and Nellis II photovoltaic solar power plants at Nellis Air Force Base; the 64 MW, 400 acre concentrating solar thermal power plant Nevada Solar One, which began operation in 2007; and the proposed 100 MW Playa Solar 2 project. The 100 MW Playa Solar 2 project is a photovoltaic power station proposed by First Solar with a 20-year power purchase agreement with NV Energy for $0.0378 per kilowatt-hour. This is lower than the lowest price available in the previous year of $0.046 (from the 100 MW Boulder Solar plant).
See the list of power stations in Nevada, which includes solar power plants in Nevada, as well as generation facilities based on other sources.
Solar Power Nevada Video
Solar Related Businesses in Nevada
Prominent Nevada-based solar installation companies include Summerlin Energy, Bombard Renewable Energy, and Hamilton Solar.
Nevada had 129 MW in private installations of rooftop solar in 2015.
Incentives
The federal Residential Energy Efficient Property Credit (income tax credit on IRS Form 5695) for residential PV and solar thermal was extended in December 2015 to remain at 30% of system cost (parts and installation) for systems put into service by the end of 2019, then 26% until the end of 2020, and then 22% until the end of 2021. It applies to a taxpayer's principal and/or second residences, but not to a property that is rented out. There is no maximum cap on the credit, and the credit can be applied toward the Alternative Minimum Tax, and any excess credit (greater than that year's tax liability) can be rolled into the following year.
Net Metering Controversy
Net energy metering rules were changed in December 2015, unfavorably for homeowners having or considering rooftop solar, and were applied even to existing installations. Some major installers, including SolarCity, Vivint, and SunRun, withdrew from the Nevada market.
After a public outcry, the earlier favorable rules were grandfathered for up to 32,000 customers whose systems were active or had a pending application by December 31, 2015.
Statistics
Nevada utility scale solar electric generation::
(*) Preliminary data from Electric Power Monthly.
Beginning with the 2014 data year, Energy Information Administration has estimated distributed solar photovoltaic generation and distributed solar photovoltaic capacity. These non-utility scale estimates project that, Nevada, generated the following additional solar energy.